±»±ØÍþƽ̨ºÚÇ®-±ØÍþÌåÓýÊ×±ØÍþÌåÓýÊ×Ò³-¹ÙÍø

±»±ØÍþƽ̨ºÚÇ®
À¸Ä¿·ÖÀà

±»±ØÍþƽ̨ºÚÇ®-±ØÍþÌåÓýÊ×±ØÍþÌåÓýÊ×Ò³-¹ÙÍø

µ±Ç°Î»Ö㺱»±ØÍþƽ̨ºÚÇ® > ¼Ó¹Ì²ÄÁÏ > ²é¿´ÄÚÈÝ
¹à½¬ÁÏÏúÊÛ³§¼ÛÖ±Ïú£º±»±ØÍþƽ̨ºÚÇ®
±à¼­£º¼Ó¹ÌÆóÒµ  À´Ô´£º±¾Õ¾  ·¢±íʱ¼ä£º2013/12/26 9:19:06  µã»÷£º1365


Ò»¡¢ÌØÐÔ£¨¸Å¿ö£© Brief introduction of characteristic
ÊÇÒ»ÖÖÒÔÌØÑ¡½ºÄý²ÄÁÏ¡¢¾«Ñ¡¼¶Åä¹ÇÁÏ¡¢Íâ²ôÁÏ£¬¾­ÌØÊ⹤ÒÕÅäÖÆ¶ø³ÉµÄרÓùཬÁÏ£¬¾ßÓдóÁ÷¶¯¶È¡¢ ÎÞÊÕËõ¡¢ÔçÇ¿¡¢¸ßÇ¿µÈÌØµã¡£
The grouting material is made by special craft with selected cementitious materials, fine aggregate, admixture, The grouting material have a high fluidity, no shrinkage, early strength, high strength and so on.
¶þ¡¢ÓÃ; Purpose
¸÷ÖÖ»úе¡¢µçÆøÉ豸£¨ÖØÐÍÉ豸¡¢¸ß¾«¶ÈÄ¥´²£©µÄÎÞµæ°å°²×°
¸Ö½á¹¹°²×°¹¤³Ì¡£
Öù»ù¡¢×®»ù¡¢ÑÒ»ù¹à½¬¹Ì¶¨¡£
¿ò¼Ü½á¹¹½ÓÍ·µÄê½Ó¡£
ÐÞ²¹¸Ö½îíŽṹµÄ·äÎÑ¡¢¿×϶¡£
For the no baseplate installation of Machinery, electrical equipment (heavy equipment, high-precision grinding machine)
Steel installation
grouting fixing of Column base, pile, rock foundation
Frame joints connection
Repair the honeycomb and pore of reinforced concrete structures.
Èý¡¢¼¼ÊõÖ¸±ê Specifications

ËÄ¡¢ÔËÊäÓëÖü´æ Transport and storage
ÔÚÔËÊäÖÐÓ¦·ÀÖ¹Êܳ±£¬Öü´æÖб£³Ö¸ÉÔ´ÓÉú²úÖ®ÈÕÆð£¬ÔÚδ¾­Êܳ±±£´æÏÂÖü´æÆÚΪÈý¸öÔ¡£³¬¹ýÈý¸öÔ ÐèÒª¸´¼ì£¬ºÏ¸ñºó²Å¿ÉʹÓá£
It should be prevent from moisture during transportation and maintain dry in storage. The storage time without moisture is three months from the production date.Re-examination ?should carry out when the storage time is more than three months and it must be qualified before use.

 

±»±ØÍþƽ̨ºÚÇ®ÊÇÓɹú¼Ò½¨É貿ÉóÅú,½¨ÉèÌü°ä·¢µÄÌØÖÖרҵ¹¤³Ì³Ð°ü×ÊÖÊµÄ¼Ó¹ÌÆóÒµ¡£µç»°£º187-7695-7568£¬ÆóÒµÓµÓÐ×ÊÉîµÄ¼¼ÊõÈËÔ±.¾ß±¸×¨ÒµµÄÊ©¹¤¶ÓÎé ¹¤³ÌÉæ¼°·¿Îݽ¨Öþ£¨°ì¹«Â¥¡¢É̳¡¡¢±ö¹Ý¡¢·¹µê¡¢¹«Ô¢¡¢Ò½Ôº¡¢Ñ§Ð£¡¢ÌåÓý³¡¹Ý¡¢±ðÊûµÈ£©¡¢µÀ·ÇÅÁº¡¢¸ÖÌú¸ß¯»ù´¡¡¢¸Û¿ÚÂëÍ·¡¢µØÌúËíµÀµÈÎÒÆóÒµ³Ð½ÓÈ«¹ú¼Ó¹Ì¹¤³Ì.
ÍøÕ¾Ö§³Å£º¹ãÖݿƶÜÍøÂç ¹ ADMIN

±»±ØÍþƽ̨ºÚÇ®|±ØÍþÌåÓýÊ×±ØÍþÌåÓýÊ×Ò³

XML µØÍ¼ | Sitemap µØÍ¼